An inspection revealed "concerns about the concrete". Not good. Repairing bridge supports is not a fast process. The spring, summer, and fall are going to be impacted, other beaches are going to be impacted by the influx of waterlovers shut out from Ponquogue and points west. The Bowl is out. Not good.
https://www.eastendbeacon.com/ponquogue-bridge-closed-for-inspection-by-engineers/
Recent Comments